Close
Login to Your Account
Faadooengineers




Results 1 to 2 of 2

Thread: Manufacturing process of 600mw tg stator winding project report ebook download doc

  1. #1
    Fuchcha FaaDoO Engineer narendradudi's Avatar
    Join Date
    Aug 2012
    Posts
    2

    Gender: : Male

    Branch: : Electrical Engineering

    City : Jodhpur

    Send Private Message
    Send Friend Request

    Doc 32 Manufacturing process of 600mw tg stator winding project report ebook download doc

    Power generation Sector comprises Thermal, Gas, Hydrogen Nuclear power plant business. As of 31-3-2007. BHEL supplied sets accounts for 80,781 MW or nearly 65% of the total install capacity of 1,25,414 MW in the country. Significantly these sets contribute 73% of the total power generated in the county. BHEL has proven turnkey capabilities for executing power projects from Concept to Commissioning. It possesses the technology and capability to produce Thermal sets with super critical parameters up to 1000MW unit rating and gas turbine generator sets of up to 300MW units rating. Co-generating and Combined cycle plants have been introduce to achieve higher plant efficiencies. To make efficient use of the high-ash-content coal available in India. BHEL also supplies circulating Fluidized Bed Combustion (CFBC) boilers for Thermal plants.


    Attached Files for Direct Download
      File Name:
      File Size:
      7.17 MB
    * Click on the 'file icon' or 'file name' to start downloading

  2. #2
    Fuchcha FaaDoO Engineer
    Join Date
    Dec 2012
    Posts
    1

    Gender: : Male

    Branch: : Electrical Engineering

    City : Bangalore

    Send Private Message
    Send Friend Request

    Re: B.h.e.l. Block 4 report

    i amm nabin kumar yadav eee engineer

Tags for this Thread